New well put into operation in “Oil Rocks” field

New well put into operation in “Oil Rocks” field
The drilling works at well № 2521 from the platform № 2523 in "Oil Rocks" field have been completed succefully. The daily flow rate of the well № 2523 is 8 tons of oil.

12 well drilled from the same platform drilling are expected also.

Bütün xəbərlər Facebook səhifəmizdə