Ten railway stations along the railway line in the Nakhchivan Autonomous Republic of Azerbaijan are planned to be rebuilt, Azerbaijan Railways (ADY) told SİA.
According to ADY, along the 194.1-kilometer railway line, 814 engineering structures will also be constructed, including 29 bridges and 4 tunnels.
This railway line will connect to the Zangazur corridor, ensuring both a direct land link between the main part of Azerbaijan and Nakhchivan, and access to Turkish and European markets as an important segment of the Middle Corridor and North-South route.
Bütün xəbərlər Facebook səhifəmizdə

USD
EUR
GBP
RUB